RENCANA OPERASI KERETA API DI STASIUN HELVETIA

Firman Choirony, Firman and JULISON ARIFIN, JULISON ARIFIN and AJI RONALDO, AJI RONALDO (2023) RENCANA OPERASI KERETA API DI STASIUN HELVETIA. RENCANA OPERASI KERETA API DI STASIUN HELVETIA, 1 (1). pp. 1-11.

[img] Text
jurnal Rencana Operasi Kereta Api di Stasiun Helvetia_Firman Choirony.pdf

Download (512kB)

Abstract

The extension of the Medan - Binjai Airport Raillink is planned to operate in 2024. With this in mind, the construction of the Helvetia Station must be ready to support the extension of the Medan - Binjai Airport Raillink. The train operation plan at Helvetia Station must be able to support airport trains and passenger trains that pass through the station. Where the operation plan must be adjusted to calculate Headway, traffic capacity, and proposed travel plans. From the research conducted, it can be concluded that it is necessary to add 1 lane so that there is no conflict between trains at the station and Helvetia Station is divided into 3 zones, passenger routes are made so that passengers go according to their respective routes and there are no clashes.

Item Type: Article
Uncontrolled Keywords: North Sumatera, Helvetia Station, and Train Operation.
Subjects: L Education > L Education (General)
Divisions: Diploma III Manajemen Transportasi Perkertaapian
Depositing User: Keretaapi KA 1.3
Date Deposited: 06 Jun 2024 01:27
Last Modified: 06 Jun 2024 01:27
URI: http://digilib.ptdisttd.ac.id/id/eprint/5293

Actions (login required)

View Item View Item