ANALISIS KAPASITAS LINTAS PADA LINTAS BANDUNG–CICALENGKA TERHADAP PEMBANGUNAN DOUBLE TRACK

AGUSTINUS INDRA PURNAMA, INDRA (2023) ANALISIS KAPASITAS LINTAS PADA LINTAS BANDUNG–CICALENGKA TERHADAP PEMBANGUNAN DOUBLE TRACK. Diploma thesis, UNSPECIFIED.

[img] Text (cover)
cover.pdf
Restricted to Registered users only until 2 January 2028.

Download (118kB) | Request a copy
[img] Text (daftar isi)
daftar isi.pdf
Restricted to Registered users only until 10 January 2028.

Download (114kB) | Request a copy
[img] Text (bab i)
bab I.pdf
Restricted to Registered users only until 13 January 2028.

Download (106kB) | Request a copy
[img] Text (bab ii)
BAB II.pdf
Restricted to Registered users only until 18 January 2028.

Download (852kB) | Request a copy
[img] Text (bab iii)
BAB III.pdf
Restricted to Registered users only until 19 January 2028.

Download (193kB) | Request a copy
[img] Text (bab iv)
BAB IV.pdf
Restricted to Registered users only until 19 January 2028.

Download (135kB) | Request a copy
[img] Text (bab v)
BAB V.pdf
Restricted to Registered users only until 19 January 2028.

Download (413kB) | Request a copy
[img] Text (bab vi)
BAB VI.pdf
Restricted to Registered users only until 26 January 2028.

Download (100kB) | Request a copy
[img] Text (daftar pustaka)
daftar pustaka.pdf
Restricted to Registered users only until 3 January 2028.

Download (413kB) | Request a copy

Abstract

On the Bandung-Cicalengka railway route, there are single-track sections, specifically on the Kiaracondong-Gedebage and HaurpugurCicalengka segments. Currently, double-track construction is underway on these single-track sections, which is transforming the track specifications on the Bandung-Cicalengka route. The single-track sections currently have a capacity of 131 trains per day on the Kiaracondong-Gedebage segment and 121 trains per day on the Haurpugur-Cicalengka segment. To assess the increased capacity of the railway on the segments undergoing double-track construction, it is necessary to conduct an analysis related to railway capacity.The research results indicate that, based on theoretical capacity calculations, the capacity of the railway on the segments being upgraded to double track increases to 347 trains per day on the Kiaracondong-Gedebage segment and 400 trains per day on the Haurpugur-Cicalengka segment. Therefore, the Bandung-Cicalengka railway route can accommodate additional train journeys as needed, as there is unused railway capacit

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Railway Capacity, Railway Operation Patterns, Railway Journey Graph, Kapasitas lintas, Pola Operasi Kereta api, Grafik Perjalanan Kereta Ap
Subjects: L Education > L Education (General)
L Education > LG Individual institutions (Asia. Africa)
Divisions: Diploma III Manajemen Transportasi Perkertaapian
Depositing User: Perkeretaa MTP 1.2
Date Deposited: 04 Nov 2024 03:52
Last Modified: 04 Nov 2024 03:52
URI: http://digilib.ptdisttd.ac.id/id/eprint/5965

Actions (login required)

View Item View Item