EVALUASI HALTE ANGKUTAN PEDESAAN PADA TRAYEK SITUBONDO-BANYUPUTIH DI KABUPATEN SITUBONDO

ANAK AGUNG MAHACAHAYANI, MAHACAHAYANI and ELI JUMAELI, ELI JUMAELI and WISNU WARDANA KUSUMA, WISNU WARDANA KUSUMA (2024) EVALUASI HALTE ANGKUTAN PEDESAAN PADA TRAYEK SITUBONDO-BANYUPUTIH DI KABUPATEN SITUBONDO. Diploma thesis, POLITEKNIK TRANSPORTASI DARAT - STTD INDONESIA.

This is the latest version of this item.

[img] Text
LAMPIRAN.pdf

Download (1MB)
[img] Text
BAB VI.pdf
Restricted to Registered users only

Download (55kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf

Download (59kB)
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (126kB) | Request a copy
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (7MB) | Request a copy
[img] Text
BAB III.pdf
Restricted to Registered users only

Download (342kB) | Request a copy
[img] Text
BAB II.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text
BAB 1.pdf
Restricted to Registered users only

Download (69kB) | Request a copy
[img] Text
DAFTAR ISI.pdf

Download (195kB)
[img] Text
COVER.pdf

Download (306kB)

Abstract

North coast of Java Island. Based on data obtained from the Situbondo Regency Transportation Service, there are 8 stops on the Situbondo-Banyuputih route. However, there are 15 existing bus stops and the stops on the Situbondo - Banyuputih route have not been utilized properly. Many passengers get on and off at random places due to the poor and damaged condition of the bus stop buildings and facilities as well as the location of the bus stops being far from passenger pockets. Therefore, it is necessary to evaluate determining the number of bus stops needed in order to provide safety to users. To determine the number of bus stops needed, the Strugas calculation formula from statistical science is used. From the analysis that has been made, it is necessary to add 14 bus stops to the rural transport passenger compartment. Passenger bags that do not meet the calculations are proposed for the construction of 23 public transport stops. The dimensions of the bus stop obtained are 4 m x 2 m with a height of 2.7 m. For suggestions related to the development of stopping place infrastructure (Halte) on the Situbondo - Banyuputih route in Situbondo Regency, namely the need to build public transportation stopping facilities in accordance with the results of the analysis of determining needs, for development it is hoped that the proposed bus stop design can be used. Keywords: bus stop, public transport stopping place, location, design

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Halte, Tempat Perhentian Angkutan Umum, Lokasi, Desain
Subjects: T Technology > TE Highway engineering. Roads and pavements
Z Bibliography. Library Science. Information Resources > Z665 Library Science. Information Science
Divisions: Diploma III Manajemen Transportasi Jalan
Depositing User: MTJ 10 2024
Date Deposited: 29 Apr 2025 02:55
Last Modified: 29 Apr 2025 02:55
URI: http://digilib.ptdisttd.ac.id/id/eprint/7723

Available Versions of this Item

Actions (login required)

View Item View Item