Raka Astra Putra Pratama, Raka Astra Putra Pratama (2024) REAKTIVASI STASIUN PONDOK RAJEG TERHADAP OPERASIONAL KRL DI LINTAS CITAYAM – NAMBO. Diploma thesis, POLITEKNIK TRANSPORTASI DARAT INDONESIA - STTD.
![]() |
Text
raka 1.pdf Download (817kB) |
![]() |
Text
raka 2.pdf Download (514kB) |
![]() |
Text
raka 3.pdf Restricted to Registered users only Download (794kB) |
![]() |
Text
raka 6.pdf Download (1MB) |
![]() |
Text
raka 4.pdf Restricted to Registered users only Download (2MB) |
![]() |
Text
raka 5.pdf Restricted to Registered users only Download (2MB) |
![]() |
Text
raka 8.pdf Download (5MB) |
![]() |
Text
raka 7.pdf Download (5MB) |
Abstract
Pondok Rajeg Station is a reactivation station on the Citayam-Nambo route which is located in Jatimulya Village, Cilodong District, Depok Regency. Pondok Rajeg Station is located at an altitude of +121 meters and was built at the end of the New Order around 1997 – 1998. In 2006 Pondok Rajeg Station was decommissioned because the Nambo KRD was old and unfit for operation. Looking at the current conditions regarding mobility and community needs, there is potential demand for passengers who will depart and end at Pondok Rajeg Station. Currently the reactivation of Pondok Rajeg Station has been completed but confirmation of its inauguration is still awaiting direction from the government. The method used is quantitative. Sample fulfillment was carried out in the community around Pondok Rajeg Station. Techniques for fulfilling the data were carried out using observation, interviews and documentation. In the passenger potential analysis stage, analysis of operating patterns and analysis according to minimum service standards to determine the readiness for operation of Pondok Rajeg Station. The results of this research are suggestions for the reactivation station, namely Pondok Rajeg Station, so that it can operate again as soon as possible. The increase in traffic capacity after the Pondok Rajeg reactivation station was operational again has had an effect on improving operating patterns on the Citayam-Nambo route. Minimum service facilities that have not been met are expected to be followed up immediately before they are inaugurated and operated, while facilities with existing equipment must be maintained and maintained in order to improve services at Pondok Rajeg Station.
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > TH Building construction |
Divisions: | Diploma III Manajemen Transportasi Perkertaapian |
Depositing User: | MTP 2 2024 |
Date Deposited: | 11 Mar 2025 04:42 |
Last Modified: | 11 Mar 2025 04:42 |
URI: | http://digilib.ptdisttd.ac.id/id/eprint/8698 |
Actions (login required)
![]() |
View Item |