AJENG MUSTIKA ANDINI, AJENG MUSTIKA ANDINI and UTUT WIDYANTO, UTUT WIDYANTO and ERFIANTO R.CHAN, ERFIANTO R.CHAN (2024) EVALUASI PEMELIHARAAN GERBONG GB 50 DI DEPO GERBONG REJOSARI. EVALUASI PEMELIHARAAN GERBONG GB 50 DI DEPO GERBONG REJOSARI. pp. 1-11. (Submitted)
![]() |
Text
04_AJENG MUSTIKA ANDINI_JURNAL_EVALUASI PEMELIHARAAN GERBONG GB 50 DI DEPO GERBONG REJOSARI.pdf Download (434kB) |
Abstract
Rejosari Carriage Depot carries out monthly maintenance for the deries which reaches 60-61 month. With only 40 people for a day to carry out routine inspections and existing facilities and equipment, entry times to the depot occur earliner and completion of inspections is later than specified in the maintenance schedule. The average maintenance at the depot every mont is 6 days/series, while the time is should be is 3 days/series, with the time between breakdowns varying each mont, so it is necessary to rearrange the maintenance schedule. At the Rejosari Carriage Depot, 35 nurses are still needed, to support the monthly inspections at the rejosari Carriage depot, apart form that, the equipment and inspection places must be improved so that the monthly inspections are more efficient and optimal.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Maintenance Schedule; Wagon Depot; Wagons |
Subjects: | T Technology > TL Motor vehicles. Aeronautics. Astronautics |
Divisions: | Diploma III Manajemen Transportasi Perkertaapian |
Depositing User: | MTP 1 2024 |
Date Deposited: | 06 Jan 2025 14:21 |
Last Modified: | 06 Jan 2025 14:21 |
URI: | http://digilib.ptdisttd.ac.id/id/eprint/8350 |
Actions (login required)
![]() |
View Item |