Analisa Dan Evaluasi Skybridge Untuk Pengaturan Arus Penumpang Di Stasiun Bandung

Jefri Susilo Utomo, Jefri Susilo Utomo and SUHARTO, SUHARTO and TOTOK LUKITO, TOTOK LUKITO (2024) Analisa Dan Evaluasi Skybridge Untuk Pengaturan Arus Penumpang Di Stasiun Bandung. Analisa Dan Evaluasi Skybridge Untuk Pengaturan Arus Penumpang Di Stasiun Bandung. (Submitted)

[img] Text
JURNAL JEFRI SUSILO UTOMO.pdf

Download (347kB)

Abstract

Abstract Bandung Station is a large class station used to serve long-distance train departures, Bandung Raya Commuter Line train stops, and Feeder Train departures. There is a skybridge facility for getting on and off train passengers who experience density during peak hours of arrival and departure, and there are problems in regulating the flow of passengers up and down because the skybridge function is not able to accommodate the flow of passengers. Therefore, it is necessary to analyse passenger forecasting, analyse the level of service of the skybridge at Bandung Station. The results showed that the level of pedestrian service on the skybridge was in category E with a calculation of pedestrian space of 1.12 m² / walker. While the level of pedestrian service on the travelator includes category F with a calculation of pedestrian space of 0.23 m² / walker. Where passengers in 2029 are predicted to reach 13,554,839 passengers or around 37,137 passengers per day. So it is necessary to add a skybridge and add static stairs and regulate the flow of passengers to be separated between getting on and off after the addition of the skybridge.

Item Type: Article
Subjects: T Technology > TH Building construction
Divisions: Diploma III Manajemen Transportasi Perkertaapian
Depositing User: MTP 4 2024
Date Deposited: 07 Oct 2024 07:20
Last Modified: 07 Oct 2024 07:20
URI: http://digilib.ptdisttd.ac.id/id/eprint/8568

Actions (login required)

View Item View Item